Class 30 One Design – Registrations are open

With the preliminary design study phase drawing to a close, the ground is now being prepared for the construction of the first Class 30, with the next phase of the project underway, which is the development of the detailed construction plans. These will be completed by the end of March 2022. The new Class 30 […]